Claim Simulation A case study in Piping Projects
Abstract
Full Text:
PDFReferences
AbouRizk, S., Dozzi, P. (1993). Application of computer simulation in resolving construction disputes. Journal of Construction Engineering and Management, 119(2), 355–373.
Adrian, J. J. (1993). Construction Claims: A Quantitative Approach. Stipes Pub Llc.
Al-Momani, A. H. (2000). Construction delay: a quantitative analysis. International Journal of Project Management, 18(1), 51-59.
Bosche, R. V. (1978). Identifying construction claims. Transactions of the American Association of Cost Engineers, 320-329.
Enshassi, A., Sherif, M., Said , E.-G. (2009). Problems associated with the process of claim management in Palestine: Contractors' perspective. Engineering, Construction and Architectural Management, 16(1), 61-72.
Ho, S. P., Liang, L. Y. (2004). Analytical model for analyzing construction claims and opportunistic bidding. Journal of Construction Engineering and Management, 130(1), 94–104.
Hwang, C.-L., Yoon, K. (1981). Multiple Attribute Decision Making Methods and Applications A State-of-the-Art Survey. Springer Berlin Heidelberg.
Ibbs, C. W. (1997). Quantitative Impacts of Project Change: Size Issues. Journal of Construction Engineering and Management, 123(3), 308-311.
Jergeas, G. F., Hartman, F. T. (1994). Contractors' construction‐claims avoidance. Journal of Construction Engineering and Management, 120(3), 553–560.
Kartam, S. (1999). Generic methodology for analyzing delay claims. Journal of construction engineering and management, 125(6), 409-419.
Kululanga, G., Kuotcha, W., McCaffer, R., and Edum-Fotwe, F. (2001). Construction contractors' claim process framework. Journal of Construction Engineering and Management, 127(4), 309-314.
Kwaka, Y., Ingall, L. (2007). Exploring Monte Carlo simulation applications for project management. Risk Management, 44–57.
Oracle, 2009, Pertmaster V 7.82 & V 8.0 Manual and Help.
PMI. (2000). Construction extension to the PMBOK® Guide. Pennsylvania: Project Management Institute.
PMI. (2013). A Guide to the Project Management Body of Knowledge ( PMBOK® Guide ) (5th ed.). Pennsylvania: Project Management Institute.
Sanati, F. (2006). Piping execution in industrial installations projects. Tehran: Jahad Daneshgahi Publications.
Scott, K. L. (1992). The management of contractual claims. Studies in Contractual Claims No. 14.
Simon, M. S. (1979). Construction Contracts and Claims. New York: McGraw-Hill.
Smith, C. A. (2011). Integrated scenario-based methodology for project risk management. University of Maryland.
Stempowski, R. (2002). Risikomanagement–Entwicklung von Bauprojekten. Graz: Nausner & Nausner Unternehmensberatung.
Stewart, R. D. (1991). Cost estimating (2nd Edition ed.). Wiley-Interscience.
Vidogah, W., Ndekugri, I. (1998). Improving the management of claims on construction contracts: consultant's perspective. Journal of Management in Engineering, 16(3), 363-372.
Vose, D. (2008). Risk analysis: a quantitative guide. John Wiley & Sons.
Yogeswaran, K., Kumaraswamy, M. M., Miller, D. R. (1998). Claims for extensions of time in civil engineering projects. Construction Management & Economics, 16(3), 283-293.
Refbacks
- There are currently no refbacks.