Quantity Surveying Estimation and Rate analysis of mall using Autocad and MS excel

Viraj Thakur, Kaustubh Patil, Harshal Mahadik, Sahil Jagade, Priyanka Rajput

Abstract


With the plan of G+2 shopping mall, Planning, Estimation and Scheduling has become a major concept to considered for smooth execution of construction works. A project turns out to be a liability after a said amount of work is done the main reason being lack of capital. The best way to manage this process is by estimating the quantities in advance as this will help in finding quantity of materials and labors required for the specified job and also help in overall cost generation of the project. Estimation is helpful in devising the amount of capital required for execution of a specific construction work which would assist the contractors/builders to better manage their finances and avoid bankruptcy. AutoCAD is the software for drafting a detailed G+2 Shopping mall plan including plan, section elevation, foundation plan, bar bending detailed plan, etc. All the important estimations like, Excavation, concrete, reinforcement, etc. are performed along with consequential steps in MS excel software.

 


Full Text:

PDF

References


Chakraborty, M. Estimating, costing, specification and valuation. (29th ed.) Kolkata: Chakarborty; 2006.

Datta, B. N. Estimating and costing in Civil Engineering. New Delhi: UBS Publications; 2016.

Rashmi J, Amey A Kelkar, Vishwanath K. "Planning and scheduling of a multi-storied residential building with conventional execution approach as compared with application of project management techniques". 2017; 4(7): 2682-2685.

Alfredo Serpell, Jose Manuel Rueda. Creative Construction Conference. Estimating the cost of new construction project using an integrated, computer-based approach; 2013 July; Budapest, Hungary.

Ayesha Binta Ali, Molla Habibur Rahman. “A study on Estimation and Costing of a seven storied residential building in Dhaka city”. Journal of Structural Engineering, its Applications and Analysis. 2019; 2(3): 1-8.

Shivanshi, Prakash Kumar Solanki, Vikas Jangir. “Comparative Study of the method of estimation and costing of building”. International Journal of Innovative and Emerging Research in Engineering. 2017; 4(4): 55-57.

Rohan Kochade, Ashutosh Shinde, et al. “Estimation and Costing of Residential Building using conventional method vs HIT- office software”. International Journal for Research in Applied Science and Engineering Technology. 2019; 7(5): 3925-3929.

J. V. M. Raman, P. Soundarya. “Planning, Designing and Estimation of high ceiling residential building (G+1)”. International Journal of Engineering Research and Application. 2019; 9(5): 60-75.

Usman Haider, Asif Nazir, el al. “Cost comparison of building project by Manual and BIM.” Civil Engineering Journal. 2020; 6(1): 34-49.

Hesham A. Abdel-Khalek, Remon Fayek Aziz, Israa A. Abdellatif, “Prepare and analysis for claims in construction projects using Primavera Contract Management (PCM)”. Alexandria Engineering Journal. 2019; 58(2): 487-497.


Refbacks

  • There are currently no refbacks.