Optimization of Project Progress Using 3d Laser Scanning Technique
Abstract
Full Text:
PDFReferences
A F Habib, M S Ghanma, & M Tait. (2004). Integration of LIDAR and Photogrammetry For Close Range Applications. 7.
Avar Almukhtar, Zaid O. Saeed, Henry Abanda, & Joseph H. M. Tah. (2021). Reality Capture of Buildings Using 3D Laser Scanners. CivilEng, 2(1), 214–235. https://doi.org/10.3390/civileng2010012
Changmin Kim, Hyojoo Son, & Changwan Kim. (2013). Automated construction progress measurement using a 4D building information model and 3D data. Automation in Construction, 31, 75–82. https://doi.org/10.1016/j.autcon.2012.11.041
Dr. Chengyi Zhang, Prof. David Arditi, & Mr. Peng Liu. (2021). Integrating Laser-scanning Technology into a Construction Engineering and Management Curriculum. 14.
Dr Jasper Mbachu. (2015). Quantity surveyor’s role in the delivery of construction projects: A review. Research Report, 22.
Geraldine S Cheok, Stefan Leigh, & Andrew Rukhin. (2002). Calibration experiments of a laser scanner (NIST IR 6922; p. NIST IR 6922). National Institute of Standards and Technology. https://doi.org/10.6028/NIST.IR.6922
Geraldine S Cheok, William C Stone, Robert R Lipman, & Christoph Witzgall. (2000). Ladars for construction assessment and update. Automation in Construction, 9(5–6), 463–477. https://doi.org/10.1016/S0926-5805(00)00058-3
Ioannis Brilakis, Manolis Lourakis, Rafael Sacks, Silvio Savarese, Symeon Christodoulou, Jochen Teizer, & Atefe Makhmalbaf. (2010). Toward automated generation of parametric BIMs based on hybrid video and laser scanning data. Advanced Engineering Informatics, 24(4), 456–465. https://doi.org/10.1016/j.aei.2010.06.006
Jacopo Alberto Bonini, Alessandro Mandelli, Stefano Marco De Gennaro, & Fabrizio Banfi. (2021). BIM Interoperability: Open BIM-Based Workflow For Heritage Building Information Modelling (HBIM). A Multidisciplinary Approach Based On Advanced 3d Tools And Exchange Formats. Proceedings ARQUEOLÓGICA 2.0 - 9th International Congress & 3rd GEORES - GEOmatics and PREServation, 1–11. https://doi.org/10.4995/arqueologica9.2021.12104
Léa Sattler, Samir Lamouri, Robert Pellerin, & Thomas Maigne. (2019). Interoperability aims in Building Information Modeling exchanges: A literature review. IFAC-PapersOnLine, 52(13), 271–276. https://doi.org/10.1016/j.ifacol.2019.11.180
Mani Golparvar-Fard, Feniosky Peña-Mora, & Silvio Savarese. (2009). D4ar – A 4-Dimensional Augmented Reality Model For Automating Construction Progress Monitoring Data Collection, Processing And Communication. 25.
Mittal, Y. K. et al., 2020. Delay Factors in Construction of Healthcare Infrastructure Projects: A Comparison amongst Developing Countries. Asian Journal of Civil Engineering, 21(1), pp. 649-661.
Mittal, Y. K., Paul, V. K. & Sawhney, A., 2019. Methodology for Estimating the Cost of Delay in Architectural Engineering Projects: Case of Metro Rails in India.
Paul, V. K. & Seth, V., 2017. Benchmarking and Objective Selection of Technologies for Housing in India Using Quality Function Deployment. Journal of Construction in Developing Countries, 22(1), pp. 63-78.
Paul, V. K., Khursheed, S. & Singh, R., 2017. Comparative Study of Construction Technologies for Underground Metro Stations in India. International Journal of Research in Engineering and Technology, 6(3), pp. 55-63.
Rastogi, A. & Paul, V. K., 2020. A Critical Review of the Potential for Fly Ash Utilisation in Construction-Specific Applications in India. Journal of Environmental Research, Engineering and Management, 76(2), pp. 65-75.
Ronie Navon & Rafael Sacks. (2007). Assessing research issues in Automated Project Performance Control (APPC). Automation in Construction, 16(4), 474–484. https://doi.org/10.1016/j.autcon.2006.08.001
Samir El-Omari & Osama Moselhi. (2008). Integrating 3D laser scanning and photogrammetry for progress measurement of construction work. Automation in Construction, 18(1), 1–9. https://doi.org/10.1016/j.autcon.2008.05.006
Sangyoon Chin, Suwon Yoon, Yea-Sang Kim, Youngsoo Jung, Soon-Chan Park, & Moonhun Chung. (2004, September 25). A Project Progress Measurement and Management System. 21st International Symposium on Automation and Robotics in Construction, Jeju, Korea. https://doi.org/10.22260/ISARC2004/0101
Sepehr Alizadeh Salehi & İbrahim Yitmen. (2018). Modeling and analysis of the impact of BIM-based field data capturing technologies on automated construction progress monitoring. International Journal of Civil Engineering, 16(12), 1669–1685. https://doi.org/10.1007/s40999-018-0320-1
Sepehr Alizadehsalehi & Ibrahim Yitmen. (2019). A Concept for Automated Construction Progress Monitoring: Technologies Adoption for Benchmarking Project Performance Control. Arabian Journal for Science and Engineering, 44(5), 4993–5008. https://doi.org/10.1007/s13369-018-3669-1
Seshadhri, G. & Paul, V. K., 2017. Intervention Strategy for Enhanced User Satisfaction Based on User Requirement Related BPAs for Government Residential Buildings. New York, International Conference on Sustainable Infrastructure 2017.
Seshadhri, G. & Paul, V. K., 2018. Validation and ranking of user requirement related building performance attributes and sub attributes for government residential buildings. Facilities.
Thu Anh Nguyen, Phong Thanh Nguyen, & Sy Tien Do. (2020). Application of BIM and 3D Laser Scanning for Quantity Management in Construction Projects. Advances in Civil Engineering, 2020, 1–10. https://doi.org/10.1155/2020/8839923
Udechukwu Ojiako, Eric Johansen, & David Greenwood. (2008). A qualitative re‐construction of project measurement criteria. Industrial Management & Data Systems, 108(3), 405–417. https://doi.org/10.1108/02635570810858796
Yelda Turkan. (2012). Automated Construction Progress Tracking using 3D Sensing Technologies. 152.
DOI: https://doi.org/10.37628/jaip.v8i1.884
Refbacks
- There are currently no refbacks.